日韩另类视频,汤唯色戒电影完整版在线观看,舒琪未删减完整版电视剧在线观看,日本免费久久,亚洲男人的天堂av,色戒下载完整版,久久久福利视频

  Homepage      Favorite      中文版
Home About Us News info Products Services Recruitment Contact us
SERVICES
Marketing
After Services
Question
Downloads
CONTACT US
Headquarter: No. 18, Yangguang Road, Xinyang Industrial Area, Haicang, Xiamen, P.R.China 361022
Tel: +86-592-6539999
E-mail: bussiness@xmzzj.com

Question
Location:Home → Services → Question
How welding operations on the loader
Public date:2015-1-21   Hits:5020

When welding work on the machine, the following provisions shall operate, in order to avoid damage to the machine, or the occurrence of accidents.

1) Before welding, you must read and understand the relevant safety requirements for welding in this machine.

2) Before welding, turn off the engine start switch, disconnect the negative power switch.

3) Before welding, you must remove the instrument panel connector, to avoid damage to the dashboard, you can also harness the cab (in the lower right of the frame is hinged near the cab) and vehicle harness disconnected.

4) continue to use unsustainable over 220V voltage.

5) the welding area and ground cables within a distance of 1 meter.

6) between the weld area and avoid grounding cable seals and bearings.

7) Do not weld or cut have fuel, oil and hydraulic oil pipes and containers.

8) Do not weld or cut a sealed container or poor ventilation.

Previous  |  Next  |   Return to
About Us
Company profile
Culture
Organizational
Development
Subsidiaries
Certificates
Products
Wheel Loader
Block Handling Wheel Loader
Excavator
Other
Spare Parts
News
Company News
Trade News
Exhibitions
Videos
Services
Marketing
After Services
Question
Downloads
Recruitment
Talent Concept
Jobs
Contact Us
Feedback
Contact us
Copyright 2014- (C) Xiamen Loaders Co., Ltd. All Rights Reserved.
Two-dimensional [Close]

點(diǎn)擊這里給我發(fā)消息
點(diǎn)擊這里給我發(fā)消息